Supermicro SuperWorkstation 5036A-T — 5036A-T.indb

Chapter 2: System Setup Chapter 2 System Setup 2-1 Overview This chapter provides a quick setup checklist to get your SuperWorkstation 5036A-T up and running. Following the steps in the order given should enable you to have the system operational within a minimal amount of time. If your system is not al- ready fully integrated with a motherboard, processor, system memory etc., please turn to the chapter or section noted in each step for details on installing specifi c components. 2-2 Unpacking the System You should inspect the box the SuperWorkstation 5036A-T was shipped in and note if it was damaged in any way.

If the workstation itself shows damage, you should fi le a damage claim with the carrier who delivered it. Decide on a suitable location for setting up and operating the SuperWorkstation 5036A-T. It should be situated in a clean, dust-free area that is well ventilated. Avoid will also need it placed near a grounded power outlet. areas where heat, electrical noise and electromagnetic fi elds are generated. You Once the SuperWorkstation 5036A-T is placed in the appropriate location, slide the locking tabs on each caster down to keep it stationary. ! ! Warnings and Precautions! Ensure that the caster wheels on the workstation are locked.

Review the electrical and general safety precautions in Chapter 4. Use a regulating uninterruptible power supply (UPS) to protect the workstation from power surges, voltage spikes and to keep your system operating in case of a power failure. Allow the power supply units and hot-swap SATA drives to cool before touch- ing them. 2-1