Supermicro SuperWorkstation 7047GR-TRF — Supermicro SuperWorkstation 7047GR-TRF User's Manual PDF

Chapter 2: Workstation Installation Chapter 2 Workstation Installation 2-1 Overview This chapter provides a quick setup checklist to get your SuperWorkstation 7047GR- TRF up and running. Following the steps in the order given should enable you to have the system operational within a minimal amount of time. If your system is not already fully integrated with a motherboard, processor, system memory etc., please turn to the chapter or section noted in each step for details on installing specifi c components. 2-2 Unpacking the System You should inspect the box the SuperWorkstation 7047GR-TRF was shipped in and note if it was damaged in any way.

If the workstation itself shows damage, you should fi le a damage claim with the carrier who delivered it. Decide on a suitable location for setting up and operating the SuperWorkstation 7047GR-TRF. It should be situated in a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical noise and electromagnetic fi elds are generated. You will also need it placed near a grounded power outlet. 2-3 Preparing for Setup The box your workstation was shipped in may include two sets of rail assemblies, two rail mounting brackets and the mounting screws needed to install the system into the rack (optional parts).

Please read this section in its entirety before you begin the installation procedure outlined in the sections that follow. Choosing a Setup Location Leave enough clearance in front of the rack to enable you to open the front door completely (~25 inches). Leave approximately 30 inches of clearance in the back of the rack to allow for suffi cient airfl ow and ease in servicing. 2-1