S UPER W ORKSTATION 7047GR-TRF User's Manual Figure 2-2. Identifying the Inner Rails and Chassis Handles Inner Rails Chassis Handle Installing the Chassis Handles and Inner Rails Installing the Inner Rails 1. Locate the chassis handles and handle screws. 2. Align the chassis handle with the front of the chassis and secure with the three chassis handle screws. 3. Repeats steps 1 and 2 with the other handle. 4. Locate the inner rails and screws in the shipping package. 5. Align the inner rails against the chassis, as shown. Confi rm that the rails are fl ushed against the edge of the chassis. 6. Tighten the screws. Do not over-tighten. 7. Repeat steps 5 and 6 with the other inner rail. Warning:
do not pick up the server with the front handles. They are de- signed to pull the system from a rack only. 2-6