01 - HOW TO USE THIS MANUAL General Information used. In case of the repair item is about some function system instead of a component or a part, the digit "0" is used. [4]: Repair Instructions Briefly explain repair items in the form of text. [5]: Part No. [6]: Additional Station Ex is the abbreviation of Exclude. Additional station indicates the repair station needs to be performed before proceeding to the next repair station. When calculating labout time, add the labour time of additional station. Abbreviations [7]: Labour Time Standard Labour time standard:
The time to a series of activities (including vehicle reception, malfunctions judgment, parts procurement, servicing & operating, vehicle delivery, etc.) is included. For labour time, every 100 units is one hour. Calculation of labour time: NOTE • When calculating working hours, only repairing time of the primary operations would be given directly. In case of both primary and secondary operations are co-existed, the working hours are calculated by adding the time amount for secondary operations to that for primary operations. • w/o Additional Station As shown in the illustration, the labour time is 20 if there is no additional station.
• w/ Additional Station As shown in the illustration, if there is additional station, calculation of labour time is 10 + 120 =130. 01 - 4 Abbreviations Meaning Abbreviations Meaning A/C Air Conditioning LWR Lower ABS Anti-Lock Brake System MD Middle ASSY Assembly MT Manual Transmission BCM Body Control Module OTR Outer CD Compact Disc PCV Positive Crankcase Ventilation CVT Continuously Variable Transmission RH Right FR Front RR Rear HVAC Heating, Ventilation and Air Conditioning SD Side INR Inner UPR Upper LH Left W/ With W/O Without