Installing the Condenser Roof Mounted Important: See Section 4 - Unit Installation Standards and Procedures in the Thermo King Vehicle Powered Truck Installation Standards and Procedures Guide (TK 56430). THESE PROCEDURES MUST BE FOLLOWED! 1. Position condenser onto roof and install mounting hardware as shown. a. Rotate rubber compensation washers until condenser is level. b. Tighten hardware to 7 ft-lbs (10 N•m). 2. Reinstall electric box cover and reattach “Power Off Device” connector. 3. Route electrical harnesses through access hole in condenser frame and into cargo area. Figure 2. Roof Mounted Condenser Shown 8 9 RCS1678 6 7 5 1 2 3 4 1. Bolt, M10 2. Washer, large metal M10 3.
Washer, flat rubber 4. Vehicle roof 5. Washer, large rubber (with incline) 6. Washer, small rubber (compensation) 7. E-100 Condenser frame 8. Washer, split lock M10 9. Nut, M10 14 TK 56881-18-IM-EN