Downloaded from https://www.everyspec.com MIL-STD-1311C 31 January 2001 METHOD 3246A HYDROGEN THYRATRON OPERATION 1. Test procedures. Hydrogen thyratrons shall be tested in the basic circuit shown on figure 3246-1. The tube shall be tested in a circuit constructed to produce the conditions specified on the TSS. The conditions specified in 4.12 (Definitions and instructions for pulse modulators and pulse diodes) are only for the purpose of determining circuit constants. The actual operating voltages and repetition rates for each test are specified under the particular conditions or under general test conditions.
Tests performed at repetition rates less than the resonant charging rate shall be made with a charging diode. The anode power supply shall be capable of being varied from zero to the maximum voltage required and the grid drive shall be adjustable as required. The tube shall operate as specified. During operation tests, the specified number of kick-outs as a result of continuous conduction shall not be exceeded and there shall be no evidence of detrimental anode heating. 1.1 Tubes with hydrogen reservoirs having adjustable reservoir heater voltage shall be operated at the specified reservoir heater voltage marked on the tube.
1.2 Tubes with hydrogen reservoirs connected internally to the heater shall be operated at the specified heater voltage. 2. Operation at elevated ambient temperature. Elevated ambient temperature tests shall be made at the operating conditions and ambient temperatures specified on the TSS. Not more than three breakdowns shall be permitted during the entire operating period. a. Tubes without reservoirs shall be operated at the bogey-filament voltage for the entire operating period. b. Tubes with reservoirs tied directly across the heater shall be operated at the upper limit for heater voltage for the entire operating period. c.
Tubes with a separate reservoir lead shall be operated at the high end of the reservoir range. 3. Operation of optimum reservoir voltage. This test is performed to determine compliance with the reservoir voltage when marked. The procedure for the test shall be as follows: a. Set up the trigger and anode circuits for operation under operation test conditions. b. Set the reservoir voltage at the value specified on the TSS. c. After the specified warm-up period, apply the trigger voltage to the grid of the tube. Start the anode voltage at the minimum position of the voltage control and raise the voltage until the specified epy has been reached. d.
The tube shall operate continuously for the time specified without evidence of arc-back or anode heating. e. The value marked on the base shall be within the limit(s) specified on the TSS. METHOD 3246A 25 March 1970 3246-1