Department of Defense MIL-STD-1311C — MIL-STD-1311C Test Methods for Electron Tubes – DoD Standard PDF

Downloaded from https://www.everyspec.com MIL-STD-1311C 31 January 2001 METHOD 3268B ENERGY DIVERTER (CROWBAR) OPERATION (Hydrogen modulators) 1. Energy diverter operation. In the test circuit as shown on figure 3268-1 the anode voltage shall be maintained and the tube triggered as specified. A tube which fires without being triggered is a failure. A tube which does not fire when triggered is also a failure. 2. Energy diverter anode delay time. Under the operation test conditions, the energy diverter anode delay time shall not exceed the specified value.

The anode delay time shall be measured from the 25 percent point of the unloaded single pulse trigger to the start of the anode current pulse. NOTE: : Include R V as part of R . FIGURE 3268-1. Basic energy diverter thyratron operation test circuit. METHOD 3268B 28 March 1975 3268-1