Downloaded from https://www.everyspec.com MIL-STD-1311C 31 January 2001 METHOD 4446 (OBSOLESCENT) SPIKE-LEAKAGE ENERGY (TR tubes) The leakage energy shall be measured after a shelf life of 7 days. The tube shall be mounted as a series tee with the rf power in the main line set for the conditions specified. With the ignitor current adjusted to the given value, the average leakage power through the tube shall be measured at each of the two designated pulse durations tp1 and tp2. The spike-leakage energy (Ws) shall be within the limits specified when determined as follows: tp tp tp P P P prr Ws ) 2 1 ( 1 ) 2 1 ( 1 10 7 Where: P1 = Average leakage power at tp1, in watts.
P2 = Average leakage power at tp2, in watts. METHOD 4446 4446-1 19 April 1968