Department of Defense MIL-STD-1311C — MIL-STD-1311C Test Methods for Electron Tubes – DoD Standard PDF

Downloaded from https://www.everyspec.com MIL-STD-1311C 31 January 2001 FIGURE 4452-6. Equipment layout No. 1 for leakage power measure- ments on tubes terminating the line. 2.3.3.2 A circuit in which the basic circuit of figure 4452-1 (b) is combined with a branch circuit containing a signal generator which is used in calibrating the oscilloscope, is shown on figure 4452-7. An optional power monitoring circuit is included. The signal generator branch may be removed once the oscilloscope has been calibrated in terms of power level. FIGURE 4452-7. Equipment layout No. 2 for leakage power measure- ments on tubes terminating the line. 2.3.4 Dual tubes.

2.3.4.1 The basic circuit shown on figure 4452-1(c) is used in making leakage power measurements on dual tubes. This circuit, as shown, uses a power meter for measuring the leakage power. An oscilloscope circuit could be used in place of the power meter as already described for branched duplexer tubes and tubes terminating the line. 3. Procedure. 3.1 Power meter measuring circuits METHOD 4452A 18 August 1970 4452-4