US Army Developmental Test Command · TOP 1-2-622 · 54 pp.
TOP 1-2-622 Vertical Electromagnetic Pulse (VEMP) Testing Manual PDF
Related manuals
Contents
Document text
REPORT DOCUMENTATION PAGE
Downloaded from https://www.everyspec.com Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std. Z39-18 REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information on Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) 11-09-2009 2. REPORT TYPE Final 3.
DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 1-2-622 Vertical Electromagnetic Pulse (VEMP) Testing 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHORS 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) TEDT-WSV-N Bldg 21225 White Sands Missile Range, NM 88002 8. PERFORMING ORGANIZATION REPORT NUMBER TOP 1-2-622 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) Test Business Management Division (TEDT-TMB) US Army Developmental Test Command 314 Longs Corner Road Aberdeen Proving Ground, MD 21005-5055 10. SPONSOR/MONITOR’S ACRONYM(S) 11.
SPONSOR/MONITOR’S REPORT NUMBER(S) Same as item 8 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited. 13. SUPPLEMENTARY NOTES Defense Technical Information Center (DTIC) AD No.: ADA505640 14. ABSTRACT This TOP provides methods for planning, providing instrumentation, and execution of testing of Army/DOD Materiel to determine the effects of Vertical Component High Altitude Electromagnetic Pulse (VHEMP) Environment on the safety and/or reliability of the DOD materiel and Commercial Infra-Structure.
The content will include facilities, instrumentation setup, new testing procedures, actual environmental considerations, data recording and presentation of results, photos of recommended test equipment and test setups will be included along with some representative data plots. This document will incorporate the requirements of MIL-STD-464A and MIL-STD-2169 that provide DOD EMP guidance. 15. SUBJECT TERMS High Altitude Electromagnetic Pulse, Vertical Electromagnetic Pulse, Nuclear Weapons Effect Testing and Environments. 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT SAR 18. NUMBER OF PAGES 54 19a. NAME OF RESPONSIBLE PERSON a. REPORT Unclassified B. ABSTRACT Unclassified C.
THIS PAGE Unclassified 19b. TELEPHONE NUMBER (include area code)
REPORT DOCUMENTATION PAGE
Downloaded from https://www.everyspec.com US ARMY DEVELOPMENTAL TEST COMMAND TEST OPERATIONS PROCEDURE * Test Operations Procedure 1-2-622 11 September 2009 DTIC AD No.: ADA5-5640 VERTICAL ELECTROMAGNETIC PULSE TESTING Paragraph 1. SCOPE ................................................................................ 2 2. FACILITIES AND INSTRUMENTATION ...................... 2 2.1 Facilities ............................................................................. 2 2.2 Instrumentation ................................................................... 4 2.3 Test Controls ...................................................................... 5 3.
REQUIRED TEST CONDITIONS .................................... 5 3.1 Test Preparation .................................................................. 5 3.2 Test Execution .................................................................... 9 3.3 Test Reporting and Life Cycle ........................................... 11 4. TEST PROCEDURES ....................................................... 12 4.1 Test System ........................................................................ 12 4.2 Baseline System ................................................................. 13 4.3 Test Setup ...........................................................................
13 4.4 Test ..................................................................................... 14 5. DATA REQUIRED ............................................................ 14 6. PRESENTATION OF DATA ............................................ 15 6.1 Data Appropriation and Compliance .................................. 15 6.2 Data Reduction ................................................................... 16 6.3 Data Presentation ................................................................ 17 APPENDIX A. ELECTROMAGNETIC E&E ............................................ A-1 B. DETAILED TEST PLAN SUBTEST EXAMPLE ............ B-1 C. DATA TABLES AND DOCUMENTATION ...................
C-1 D. VEMP ORDINANCE TEST INFORMATION ................. D-1 E. OVERVIEW OF VEMP TEST INSTRUMENTATION AND MATHMEMATICS ................................................. E-1 F. ABBREVIATIONS ............................................................ F-1 G. GLOSSARY ....................................................................... G-1 H. REFERENCES ................................................................... H-1 Approved for public release; distribution unlimited.
REPORT DOCUMENTATION PAGE
Downloaded from https://www.everyspec.com TOP 1-2-622 11 September 2009 1. SCOPE. This Test Operations Procedure (TOP) is a general outline on test and analysis procedures required to determine the effects of a specified Vertical Electromagnetic Pulse (VEMP) environment on Army materiel. The purpose of these test and analysis procedures is to ascertain the degree to which the Operational Requirements Document (ORD), Capabilities Development Document (CDD), Army Regulation (AR) 70-75 1** , Independent Evaluation Plan (IEP)/Independent Assessment Plan (IAP) criteria, and Army Nuclear Hardening Criteria (NHC) are met.
Army materiel can consist of complete end items, subsystems, Line Replaceable Units (LRUs), components or piece-parts of major systems. All materiel must be tested and analyzed to its NHC with respect to the performance of all its mission essential functions. Realistic hardware, and practical test configurations and scenarios must be tested and analyzed in order to achieve an accurate and complete VEMP Survivability Test and Assessment (STA). All VEMP STAs must include a three phase approach in order to meet the requirements of Department of Defense Instruction (DODI) 5000.1 2 , AR 70-75 and its NHC 3 .
This TOP adheres to an integrated set of test principles and procedures that will result in timely, reliable, and consistent data for VEMP survivability assessment. This document is encouraged for use by all VEMP survivability testers (government and contractor) for test planning, for test conducting, and for acquiring and analyzing data in technical and customer tests. 2. FACILITIES AND INSTRUMENTATION. 2.1 Facilities. Acceptable VEMP test facilities can be categorized as radiating VEMP or bounded wave VEMP. Simulators in these categories will be vertically polarized.
Vertically polarized simulators should be utilized on systems which response vertically such as missiles, aircraft or those possessing large vertical antennas. Item Requirement Vertical Electromagnetic Pulse Simulator To be able to provide test items, such as missiles, aircraft and high vertical antenna structures to the required Electric Field (E-Field) and Magnetic Field (H-Field) from 25 percent to 200 percent of the MIL-STD 2169B 4 requirement. Examples of acceptable VEMP facilities are shown in Table 1 on the following page. ** Superscript numbers correspond to those in Appendix H, References. 2
REPORT DOCUMENTATION PAGE
Downloaded from https://www.everyspec.com TOP 1-2-622 11 September 2009 Table 1. Acceptable VEMP Facilities. Figure 1. WSMR VEMPS Facility. 3 Facility Type Location Comments 1. DNA ARES Bounded Wave/Vertical Kirtland Air Force Base (KAFB), NM Max E-Field -97 kV/m Area -40 x 33 x 40h m QSTAG 244, Ed. 4 or MIL-STD 2169B System level Mothball Status 2. USA VEMPS Bounded Wave/Vertical WSMR, NM Max E-Field - 70 kV/m Area - 35 m x 35 m x 35 m QSTAG 244, Ed. 4 MIL-STD-2169B System level Operational during FY10 3. USN – VPD Radiating/Vertical Patuxent River, MD Max E-Field - 50 kV/m QSTAG 244, Ed. 4 MIL-STD-2169B Limited Testing Volume at Higher Testing Levels