U.S. Army Test and Evaluation Command · TOP 01-2-511A · 225 pp.
TOP 01-2-511A Electromagnetic Environmental Effects System Testing Manual PDF
Related manuals
Document text
Downloaded from https://www.everyspec.com Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std. Z39-18 REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information on Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) 20-11-2013 2. REPORT TYPE Final 3.
DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 01-2-511A Electromagnetic Environmental Effects System Testing 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHORS 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Survivability, Vulnerability & Assessment Directorate (TEDT-WSV-E) US Army White Sands Missile Range White Sands Missile Range, NM 88002-5178 8. PERFORMING ORGANIZATION REPORT NUMBER TOP 01-2-511A 9.
SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) Range Infrastructure Division (CSTE-TM) US Army Test and Evaluation Command 2202 Aberdeen Boulevard Aberdeen Proving Ground, MD 21005-5001 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) Same as item 8 12. DISTRIBUTION/AVAILABILITY STATEMENT Distribution Statement A. Approved for public release; distribution is unlimited. 13. SUPPLEMENTARY NOTES Defense Technical Information Center (DTIC), AD No.: This TOP supersedes TOP 01-2-511, dated 9 September 2009, TOP 01-2-512 Electromagnetic Compatibility Tests, dated 15 May 1995 and TOP 06-2-560 Compatibility, Electromagnetic dated 12 October 1979.
Marginal notations are not used in this revision to identify changes, with respect to the previous issue, due to the extent of the changes 14. ABSTRACT This Test Operations Procedure (TOP) provides the Electromagnetic Environmental Effects (E3) interface requirements and verification criteria for airborne, sea, space, and ground systems, including associated ordnance, as stated in Military Standard (MIL-STD)-464C “Electromagnetic Environmental Effects Requirement for Systems”, as well as ADS-37A-PRF “Aeronautical Design Standard for the Electromagnetic Environmental Effects (E3) Performance and Verification Requirements”. 15.
SUBJECT TERMS Electromagnetic Effects HERO Lightning Electromagnetic Pulse Electrostatic Discharge TEMPEST High Power Microwave 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT SAR 18. NUMBER OF PAGES 224 19a. NAME OF RESPONSIBLE PERSON a. REPORT Unclassified B. ABSTRACT Unclassified C. THIS PAGE Unclassified 19b. TELEPHONE NUMBER (include area code)
Downloaded from https://www.everyspec.com 7KLVSDJHLVLQWHQWLRQDOO\EODQN
Downloaded from https://www.everyspec.com US ARMY TEST AND EVALUATION COMMAND TEST OPERATIONS PROCEDURE * Test Operations Procedure (TOP) 01-2-511A 20 November 2013 DTIC AD No. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS SYSTEM TESTING Page Paragraph 1. SCOPE ................................................................................... 2 2. FACILITIES AND INSTRUMENTATION ......................... 3 2.1 Facilities ................................................................................ 3 2.2 Instrumentation ...................................................................... 6 2.3 Measurement Tolerances ....................................................... 10 3.
REQUIRED TEST CONDITIONS ....................................... 10 3.1 Test Item ................................................................................ 10 3.2 Pre-Test Evaluation ............................................................... 11 3.3 Policy and Guidance .............................................................. 12 3.4 Test Setup Calibration ........................................................... 15 4. TEST PROCEDURES .......................................................... 15 5. DATA REQUIRED ............................................................... 15 6. DATA PRESENTATION .....................................................
16 6.1 Data Analysis ........................................................................ 17 6.2 Safety Margins ...................................................................... 17 7. SUGGESTED MINIMUM E3 TESTING ............................ 20 APPENDIX A. INTRA SYSTEM ELECTROMAGNETIC COMPATIBILITY – RECEIVER DESENSITIZATION .... A-1 B. EXTERNAL RF ELECTROMAGNETIC ENVIRONMENT (EME) .................................................................................... B-1 C. NEAR STRIKE LIGHTNING (NSL) ................................... C-1 D. ELECTROMAGNETIC PULSE (EMP) ............................... D-1 E.
HELICOPTER GENERATED ELECTROSTAIC DISCHARGE (HESD) .......................................................... E-1 F. PRECIPITATION STATIC (P-STATIC) ............................. F-1 G. HAZARDS OF ELECTROMAGNETIC RADIATION TO FUEL (HERF) ....................................................................... G-1 H. HAZARDS OF ELECTROMAGNETIC RADIATION TO ORDNANCE (HERO) .......................................................... H-1 * This TOP supersedes TOP 01-2-511, dated 9 September 2009, TOP 01-2-512 Electromagnetic Compatibility Tests dated 15 May 1995, and TOP 06-2-560 Compatibility, Electromagnetic, dated 12 October 1979. Approved for public release, distribution unlimited.
Downloaded from https://www.everyspec.com TOP 01-2-511A 20 November 2013 I. TEMPEST ............................................................................. I-1 J. HIGH POWER MICROWAVE (HPM) ................................ J-1 K. INTRA SYSTEMS ELECTROMAGNETIC COMPATIBILITY, SYSTEM EMISSIONS, ELECTRIC FIELD, 10 kHz TO 40 GHz .................................................. K-1 L. INTRA SYSTEM ELECTROMAGNETIC COMPATIBILITY (EMC) SOURCE/VICTIM ................... L-1 M. PERSONNEL-BORNE ELECTROSTATIC DISCHARGE (PESD) ................................................................................... M-1 N. DIRECT STRIKE LIGHTNING (DSL) ............................... N-1 O.
ABBREVIATIONS ............................................................... O-1 P. DEFINITIONS ...................................................................... P-1 Q. REFERENCES ...................................................................... Q-1 R. APPROVAL AUTHORITY .................................................. R-1 1. SCOPE. a.
This Test Operations Procedure (TOP) provides the Electromagnetic (EM) Environmental Effects (E3) interface requirements and verification criteria for airborne, sea, space, and ground systems and platforms, including associated ordnance, as stated in Military Standard (MIL-STD)-464C 1** , as well as Aeronautical Design Standard (ADS)-37A-PRF 2 , and Army-Tank Purchase Description (ATPD)-2407 3 , or the latest version of the documents as applicable. This TOP does not provide interface requirements for subsystems and equipments operating in their defined EM Environment (EME); the control of EM Interference (EMI) characteristics of subsystems and equipments are covered in MIL-STD-461F 4 .
Additionally, the suggested Minimum E3 Test Matrices have been developed by the US Army Test and Evaluation Command (ATEC) Test Centers and agreed upon by US Army Evaluation Center (AEC) and ATEC Higher command. They were developed to provide guidance to test program systems that are unable to determine the appropriate E3 tests that should be performed for their category of materiel, or will not meet safety and performance requirements based on the item specification or contract requirements. They were also developed to address the need for Army E3 Requirements Boards on smaller Soldier items and consistency for delivery of safe and functional items to the users. b. Environments.
(1) This TOP is applicable for complete systems and platforms, both new and modified, and applies to engineering development, production and sustainment phases of the system (e.g., E3 life-cycle programs such as hardness and sustainment assurance, and surveillance testing). It should be noted that the Man/Soldier is a designated platform and should be addressed in that manner for safety and performance requirements. ** Superscript numbers correspond to Appendix Q, References. 2