Downloaded from https://www.everyspec.com System Training) should be considered, but are not required to be addressed if the sponsor 351 determines they are not appropriate. If the document sponsor determines one or more of these 352 KPPs are not applicable, they must provide the rationale for non-inclusion based on solid 353 analysis. The rationale and analysis will be reviewed by higher level authorities to determine the 354 validity of the claim. 355 356 a. Traceability to Tier 1 & 2 JCAs. Correlate the KPPs to the Tier 1 & 2 JCAs the capability 357 supports directly and ensure consistency with the JCA discussion in paragraph 1. 358 b. Force Protection.
Is the capability “designed to prevent or mitigate hostile actions against 360 personnel, resources, facilities, and critical information?” If that is the focus, then the KPP 361 should be developed. (Reference: Manual for the Operation of the JCIDS, 1 Mar 09, Enclosure 362 359 B, paragraph 2.a ) 363 364 c. Survivability. Determination of whether the capability you are producing is a “manned 365 system” is the central focus for the Survivability KPP. Is the equipment designed to enhance 366 personnel survivability? Has the system entered low rate initial production (LRIP)? If you are at 367 or beyond LRIP, this KPP is not applicable.
If you answered yes to a manned system and have 368 not entered LRIP, then the KPP should be developed. (Reference: Manual for the Operation of 369 the JCIDS, 1 Mar 09, Enclosure B, paragraph 2.a ) 370 371 d. Sustainment (Availability). This KPP is mandatory for all ACAT I programs involving 372 materiel solutions. The KPP has 2 metrics: Materiel Availability (A m ) a fleet measurement of 373 the total inventory of system’s operationally capable (ready for tasking) and Operational 374 Availability (A o ) that measures a group of systems within a unit that are operationally available.
375 Additionally, there are the two mandatory Key System Attributes (KSAs) of Materiel Reliability 376 and Ownership Cost. For ACAT II and below programs, the sponsor will determine 377 applicability. (Reference: Manual for the Operation of the Joint Capabilities Integration and 378 Development System , Appendix B, Enclosure B ) 379 380 e. Net-Ready.
The capability will be developed for all information technology (IT) and 381 national security systems (NSS) used in the automation acquisition, storage, manipulation, 382 management, movement, control, display, switching, interchange, or transmission or reception of 383 DOD data or information regardless of classification or sensitivity.” There is an exception for 384 those systems that are “closed loops” and do not communicate with external sources. Another 385 way to approach it is to determine whether the capability has a C4I interface capable of any 386 communication through the Global Information Grid (GIG).
If yes, then the NR-KPP is required 387 with all the mandated architecture, compliance statements, and Key Interface Profiles (KIPs) 388 Declaration in Appendix A. (Reference: CJCSI 6216.01E, Interoperability and Supportability 389 of Information Technology and National Security Systems, Enclosure E ) 390 391 f. Selectively applied KPPs: System Training and Energy Efficiency. The sponsor will 392 perform an analysis to determine the applicability of Selectively Applied KPPs. Selectively 393 applied KPPs are not required to be addressed by the document sponsor if your analysis 394 determines they are not appropriate. 395 396 10