Downloaded from https://www.everyspec.com 544 (1) Maintenance. 545 546 (a) Maintenance/Support Concept. 547 548 The maintenance concept. (Logistics Supportability Guide (LSG), see page 3, 549 paragraph 1a) 550 551 If CLS or ICS is initial source of system support. (LSG, see page 4, paragraph 552 1b) 553 554 Level of Repair Analysis. (LSG, see paragraph 4, paragraph 1c) 555 556 Provisioning Plan. (LSG, see page 4, paragraph 1d) 557 558 Supportability Test & Evaluation Program. (LSG, see page 4-5, paragraph 1e) 559 560 Performance Based Logistics (PBL) and Performance Based Agreements (PBA) 561 Requirements. (LSG, see page 5, paragraph 1f) 562 563 (b) Maintenance Manpower Support.
564 565 Current vs. New MOS Requirements. (LSG, see page 6, paragraph 2a) 566 567 Force Structure Implications. (LSG, see page 6, paragraph 2b) 568 Table of Organization and Equipment (TO&E)/Modified TO&E (MTO&E) 570 Changes. (LSG, see page 6, paragraph 2c) 571 569 572 Supply, Ammunition, POL support requirements: (LSG, see page 6, paragraph 573 2d) 574 575 Human Factors Engineering: (LSG, see page 6, paragraph 2e) 576 577 (c) Supply Support: (LSG, see page 7, paragraph 3a) 578 579 (d) Support Equipment. 580 581 Test, Measurement and Diagnostic Equipment (TMDE): (LSG, see page 8, 582 paragraph 4a) 583 584 Calibration requirements:
(LSG, see page 8, paragraph 4b) 585 586 Material Handling Equipment (MHE) or Container Handling Equipment (CHE) 587 Requirements. (LSG, see page 8, paragraph 4c) 588 589 17