Downloaded from https://www.everyspec.com Mandatory Appendices 816 817 Appendix A - Net-Ready KPP Products. At a minimum, you should have a High-Level 818 Operational Concept Graphic (OV-1), even if the capability does not have a NR-KPP and 819 doesn’t require all architecture views. 820 821 a. CJCSI 6212.01E , Interoperability & Supportability of Information Technology and 822 National Security Systems , 15 Dec 08 (available at:
823 http://www.dtic.mil/cjcs_directives/cdata/unlimit/6212_01.pdf) significantly changed the 824 content of Appendix A , but many of the changes advocated are not available and the CJCSI 825 6212.01D has been grandfathered for 6 months continued use through 15 Jun 09. 826 b. All views included should have accompanying text to highlight the salient point of the 828 architecture view as mandated by the DOD Architecture Framework (DODAF) available at: 829 827 http://www.defenselink.mil/cio-nii/docs/DoDAF_Volume_II.pdf . 830 831 c. If the OV-1 is the only view included in the appendix, add the following statement “This 832 capability has no C4I interface with any other system or capability.
The NR-KPP is not 833 applicable. The architecture enclosed supports and underpins the CONOPS discussion in 834 paragraph 3.” 835 836 d. If you are developing the full NR-KPP, the following products are mandatory and should 837 appear in appendix A in the order shown below for ease of review and evaluation: 838 NR-KPP statement, copy and paste the KPP description, production threshold, 839 and production objective from the KPP table in paragraph 6. Do not paste the Tier 1 840 & 2 JCA column. 841 NCOW-RM Compliance Statement (Net-Centric Operations & Warfare 842 Reference Model). 843 Information Assurance (IA) Statement of Compliance.
Verbiage for a CDD must 844 state that the “Program is in compliance” with appropriate regulations and directives. 845 The distinction between verbiage appropriate for a CDD and that of a CDD is not 846 captured in CJCSI 6212.01D. 847 KIP Declaration. Use the table below. Only fill out the rows that apply to the 848 capability you are producing. 849 850 KIP Declaration Table DISR (29 Jun 07).doc 851 852 requirement, previously submitted only SV-6 that captures critical information from 854 All Views & Operational Architecture: AV-1, OV-1, OV-2, OV-3 (new 853 the OV-3) , OV-4, OV-5, OV-6C. 855 Systems Architecture: SV-2, SV-4, SV-5, SV-6.
The SV-5 is either an Excel file 856 or a Word table at the discretion of the System’s Architect. The SV-6 must be 857 submitted as a separate Excel file . A blank SV-6 template is enclosed below based 858 23