beckhoff TS1110 — 7 First steps

First steps Fig. 55: Picture 4: Selection of the target systems If all necessary information is found and the data is downloaded successfully the TwinCAT Simulation Manager shows all selected systems within its configuration navigation tree ( Picture 5 [ } 70] ). Creating a new simulation PLC Up to now, the TwinCAT Simulation Manager only contains the original systems - the ones that must be simulated. Creating and adding a new simulation PLC is done as follows: 1. Select the PLC runtime that is intended to be simulated within the Configuration navigation tree (see Picture 5 [ } 70] ) 2. Activate "Create Simulation PLC-Project" from the context menu. 3.

Within the now appearing Dialog, the Simulation PLC runtime must be selected ( Picture 6 [ } 70] ). This dialog shows the currently available target systems. If the designated simulation system is not in the tree, it can be added via the "Search" button. 4. With leaving the dialog over "OK" the TwinCAT Simulation Manager generates a simulation framework for the selected PLC, assigns it to the specified target system and runtime and adds it to the TwinCAT Simulation Manager configuration project.

The PLC framework project will contain all located IO-Symbols (see Picture 7 [ } 70] ) of the original PLC project in reversed/mirrored allocation (inputs --> outputs and outputs --> inputs) and is ready to fill with simulation code. The next step is to fill the empty shell of the simulation project with simulation code. This is specific to the application. For this task PLC Control Application can be opened via con- text menu "Open PlcControl ...". TS1110 70 Version: 1.0