beckhoff TS1110 — 7 First steps

First steps Fig. 59: Picture 8: Activating the "Plc Project Mappings" Dialog Fig. 60: Picture 9: Mapping the Original PlC to the Simulation PLC Configuration of the simulation mode The project state is now as follows: The original and simulation target systems are designated and at least the interfaces of the simulation functionality generated. For supporting not existing hardware, the simulation settings must be adjusted. That means: Disabling of nonexistent Devices Simulation of non-existing Axes and Drives Replacing of IO functionality by the simulation PLC The devices will be disabled like shown in Picture 10 [ } 73] and Picture 11 [ } 73] .

The red 'S' marks the hardware that is deactivated in simulation mode. TS1110 73 Version: 1.0