beckhoff TS6120 — 6.1.3 Conversion

Configuration Step: Check and save configuration Save new configuration by selecting menue "File - Save As...". After successfully creating and saving of new OPC-configurationfile the next dialog offers to activate this new configuration. Select "OK" to activate the configuration. With next startup the OPC-Server will work with new settings. In case of opc server offers old previous configuration to opc-clients but a new configuration was activated this means, that OPC-server was not restarted to load fresh configuration. 3. Step: Link of PLC-Variable with Conversion-template With previous steps we defined a "conversion-Template" with detailed information about conversion handling.

Now we define, which PLC variable should be handled with conversion. This link is configured in PLC-Control as and additional information for IEC1131-variable declaration. Take care on following settings : Add a comment behind PLC-variable declaration. This comment will be interpreted by the opc-server and links this plc-variable to a previous defined conversion-template. The conversion-template with the unique conversion-ID was configured in step 1. Today just global PLC-variables can be linked to conversion-templates. Elements of structures or arrays can not be configured as an OPC-conversion. Future versions of OPC-Server will not have this limitation. TS6120 27 Version:

1.2.0 Type Req./Opt. Description High EU Req Low EU Optional High IR Optional Low IR Optional H Clamping L Clamping Disable Optional Disables this conversion. OPC-Server will ignore this conversion.