Operation | Variables 3.2.5 Variable Selection Diagram | Variable Selection Diagram After selecting Change Link.. or Linked with.. the following Selection Diagram will appear: All potentially linkable target variables will appear in the tree view of the Selection Diagram(depending on the selected variable type (input/output variable). Show Variables Unused: If you select this option, only those variables which are not yet linked will be shown. Used and Unused: With this option, all variables, including those already linked, are shown. This makes sense e.g. for outputs for which multiple links are to be defined. TwinCAT 2 43 Version: 1.7