beckhoff TX1250 — 2.6 External set value generation

TwinCAT NC Master Axes Settings of the PLC task: Ideally, the PLC task that generates and specifies the setpoints should run synchronously, i.e. with the same cycle time as the NC-SAF task (port 501). This PLC task also has to have the same high priority, perhaps an even higher one, than the NC-SVB task (port 511). Optimization options: The dead time generated due to the transport via the cyclic axis interface (also, the input information leading to the calculation of the external setpoints may be one cycle old) can be compensated for an axis that is operated in the velocity interface.

This dead time compensation can be set in the TwinCAT System Manager via the global axis parameter delay time between velocity and position (default value: 0.0 s). TX1250 25 Version: 1.1