Chapter 1: Introduction The IRQs, DMAs and I/O space resources of the Super I/O can be fl exibly adjusted to meet ISA PnP requirements, which support ACPI and APM (Advanced Power Management). 1-13
Chapter 1: Introduction The IRQs, DMAs and I/O space resources of the Super I/O can be fl exibly adjusted to meet ISA PnP requirements, which support ACPI and APM (Advanced Power Management). 1-13