CONTENTS 1 MACHINE DOCUMENTS .........................................................................................................5 1.1 VERSION OF THIS LATHE ......................................................................................................5 1.2 SHIPPING SHEET ...................................................................................................................6 1.3 TECHNICAL SPECIFICATIONS ..............................................................................................8 2 SAFETY OPERATION WITH THE MACHINE .......................................................................
10 2.1.2 SIGN “ATTENTION” ON THE MACHINE ............................................................................... 10 2.1.3 SIGN “HIGH VOLTAGE” ON THE MACHINE ........................................................................ 10 2.1.4 WARNING SIGNS ON THE MACHINE FOR THE SPINDLE DIRECTION OF ROTATION .... 11 2.1.5 WARNING SIGN ON THE MACHINE FOR HAZARD WHEN SHIFTING FEED BOX HANDLES ......................................................................................................................................
11 2.1.6 WARNING SIGN ON THE MACHINE FOR HAZARD WHEN SHIFTING GEARBOX HANDLES ...................................................................................................................................... 12 2.2 SAFETY INSTRUCTIONS FOR THE END USER .................................................................. 12 2.2.1 MACHINE SAFETY DEVICES ............................................................................................... 12 2.2.2 GENERAL SAFETY PRECAUTIONS FOR MACHINE OPERATION AND MAINTENANCE . 13 2.2.3 INSTRUCTIONS FOR OPERATOR AND MAINTENANCE PERSONNEL .............................
13 3 MACHINE INSTALLATION AND START UP ........................................................................ 16 3.1 MACHINE SHIPMENT PACKING .......................................................................................... 16 3.1.1 LIFTING AND DISPLACEMENT MACHINE ON WOODEN PALLET ..................................... 16 3.1.2 INSTRUCTIONS FOR LIFTING AND DISPLACEMENT MACHINE ON WOODEN PALLET . 17 3.2 LIFTING AND DISPLACEMENT MACHINE IN WOODEN CASE ............................................. 17 3.3 MACHINE UNPACKING........................................................................................................
18 3.3.1 PRELIMENERY CHECKS ...................................................................................................... 18 3.3.2 UNPACKING MACHINE PACKED ON WOODEN PALLET ................................................... 18 3.3.3 UNPACKING MACHINE PACKED IN WOODEN CASE ......................................................... 18 3.4 CLEANING THE MACHINE ................................................................................................... 18 3.5 MACHINE POSITIONING, FOUNDATION AND LEVELING ..................................................
19 3.5.1 FOUNDATION ....................................................................................................................... 19 3.5.2 INSTALLATION AND LEVELING ........................................................................................... 19 3.5.3 PERIODICAL CHECKS OF MACHINE LEVELING ................................................................ 20 3.6 CONNECTION TO MAINS .....................................................................................................
20 3.7 VERIFICATION THE FUNCTION OF MACHINE ELECTRIC CONTROLS AFTER CONNECTION ................................................................................................................................. 21 3.8 MACHINE START UP ............................................................................................................ 21 4 OPERATION WITH THE MACHINE ...................................................................................... 23 4.1 GENERAL ..............................................................................................................................
23 4.2 APPLICICATION OF THE MACHINE ..................................................................................... 23 4.3 MACHINE MAIN PARTS AND CONTROLS .......................................................................... 24 4.4 SPINDLE SPEED SELECT .................................................................................................... 27 4.5 FEED DRIVE .......................................................................................................................... 27 4.6 SETTING THE MACHINE FOR THREAD CUTTING ..............................................................
29 4.7 MOUNTING OF CHUCKING AND DRIVE DEVICES ............................................................. 31 4.7.1 MOUNTING A CHUCKING DEVICE ON SPINDLE NOSE (DIN55027/ISO702-III) FIG.4-13 32 4.7.2 MOUNTING A CHUCKING DEVICE ON SPINDLE NOSE (USAS B-5.9-D1/ISO702-II) (CAMLOCK) ..................................................................................................................................... 32 4.8 COOLANT SYSTEM .............................................................................................................. 33 5 MACHINE LUBRICATION .....................................................................................................
35 5.1 GENERAL .............................................................................................................................. 35 5.2 GEARBOX LUBRICATION ..................................................................................................... 35 5.2.1 GEARBOX LUBRICATION METHOD .................................................................................... 35 5.2.2 FILLING THE GEARBOX WITH OIL ...................................................................................... 35 5.2.3. OIL LEVEL ............................................................................................................................. 35 5.2.4.
OIL LEVEL VERIFICATION AND OIL ADDITION .................................................................. 35 5.2.5. GEARBOX OIL CHANGE ....................................................................................................... 35 5.3. FEED BOX LUBRICATION .................................................................................................... 36 C:\Users\ELENA\Desktop\UL_C8C_325_ENG.doc 3/67