ZMM-Sliven C8C CU 325 — ZMM-Sliven C8C CU 325 Universal Lathe Machine Manual PDF

5.4.4. OIL LEVEL VERIFICATION AND OIL ADDITION Warning: Since apron oil decrease faster due to the reason that beside lubrication the apron mechanisms it oil also lubricate the screw. Therefore, the level should be verify every day on the apron oil level indicator glass. 5.4.5. OIL CHANGE Recommended periods for apron oil change: First change: 10 – 15 workdays after machine start up. Second change: 20-30 workdays after first change. Then: in a 2 -3 work months periods. Hint: It is recommended that before fill new oil wash the apron with suitable washing liquid commercially available. 5.5 LEAD SCREW AND LEAD SHAFT BEARINGS LUBRICATION The bearings are factory greased.

Grease change is recommended after repair or change a bearing. 5.6 LUBRICATION THE SLIDING SURFACES OF UPPER CARRIAGE, LOWER CARRIAGE, COMPOND AND SLIDES In compliance with Table 5-1. “Recommended lubricants” and Diagram 5-1. “Machine lubrication” the operator must daily lubricate by oilcan through respective oilers.

5.7 LUBRICATION THE DIAL OF CARRIAGE CROSS FEED The dial on the carriage cross feed should be periodically lubricated through oiler 8, Fig.5-1 and in compliance with Table 5-1 “Recommended lubricants” and Diagram 5-1 “Machine lubrication” 5.8 TAILSTOCK LUBRICATION The tailstock quill and screw are daily lubricated by oilcan through respective oilers and in compliance with Table 5-1. “Recommended lubricants” and Diagram 5-1. “Machine lubrication”. 5.9 QUADRANT LUBRICATION The quadrant change over gears should be grease lubricated once a month. However, when operate the machine under damp tropical environment it is recommended to cover entire surface of the gears with grease.

C:\Users\ELENA\Desktop\UL_C8C_325_ENG.doc 38/67