Downloaded from https://www.everyspec.com ADS-43A-HDBK Other applicable documents listed elsewhere in this document: ATCOM Reg 702-7, Flight Safety Parts Program Management AMC 702-32, Critical Safety Items Program Federal Acquisition Regulation, Part 6 and Subpart 9.2 MIL-I-45208, Inspection Requirements (or as specified in the contract) AV-E-8593D, Engines, Aircraft, Turboshaft and Turboprop, General Specifications for. Federal Test Method Standard No.
15 1 Metal, Test Methods of NISO 239.18.199X Scientific and Technical Reports, Elements, Organization and Design (or as specified in the contract) MIL-STD-8 1 OC, Environmental Test Methods and Engineering Guidelines ATCOM QE-STD-1 Flight Safety Parts Quality Systems Requirements ATCOM Competition Advocates Shopping List (CASL) ET-STD 1 Engineering Test Requirements for New Sources MIL-STD-498C Software Development and Documentation 1.3 GENERAL REQUIREMENTS 1.3.1 General The ETTs, in the FSPIS, provides lists of engine parts, components, and assemblies with the qualification requirements an alternate source must meet before that source can be approved to manufacture the component.
Production components must be manufactured by the alternate source using the same facilities, equipment, and procedures that were used to manufacture the substantiation test articles (see paragraph 1.3.6). Requirements listed for assemblies include all requirements listed for parts and components used in that assembly. The alternate source must certify they have a quality program established which meets the requirements of MIL-I-45208 or a comparable higher-level non- government quality system before qualification testing may commence. (Mandatory 100% inspection in accordance with MIL-Q-9858A requires a waiver.) This certification should be submitted as part of the inspection report.
1.3.2 Source Control Drawings Source Control Drawings (SCD) list those sources that are qualified to produce that particular component. The alternate source must satisfy all requirements specified by the SCD, any associated procurement specification, and requirements specified herein in order to be approved. Any duplication of requirements may be ignored. A test plan for substantiating compliance with SCD requirements must be submitted to USAATCOM engineering for approval prior to testing. The required Design Qualification Testing must 5