Department of the Army AR 700-127 — Army Regulation AR 700-127 Integrated Logistics Support Manual (2007) PDF

Downloaded from https://www.everyspec.com Contents—Continued B. Key PBL Milestones and Decision Points, and Implementation Checklist, page 48 C. Management Control Evaluation Checklist for the Integrated Logistics Support Program, page 51 Table List Table 3–1: Integrated logistics support (ILS) elements, page 11 Table 4–1: BCA Approval thresholds (type II (formal) BCAs), page 25 Figure List Figure 3–1: Integrated logistics support process, page 10 Figure 4–1: PBL implementation model, page 15 Figure 4–2: PBL process decision flowchart, page 16 Figure 4–3: Sample PBL team, page 18 Figure 4–4: Organic PBA outline, page 20 Figure 4–5: Spectrum of PBL strategies, page 24 Figure 4–6:

PBL BCA format, page 27 Figure 5–1: Depot source of repair determination process, page 36 Figure 5–2: Statutory relationships, page 38 Glossary iv AR 700–127 • 27 September 2007