Downloaded from https://www.everyspec.com Contents—Continued Seat belts and restraints • 8–11, page 32 Survival equipment • 8–12, page 32 Table 10–2: LCCS Contract OSA aircraft annual flying hour program, page 38 Section III Personnel and Training Requirements, page 33 ALSE maintenance personnel • 8–13, page 33 Training of ALSE maintenance personnel • 8–14, page 33 Training for aircrews • 8–15, page 33 Figure List Figure 6–1: Safety of flight message content, page 26 Figure 6–2: SOF and ASAM compliance reporting example, page 26 Figure 6–3: Aviation safety action message, page 29 Figure 10–1: Standard format for flying hour requirements (RCS CSGPO-464), page 38 Figure 10–2:
Format for quarterly projections report (RCS GPSGP- 463)., page 39 Figure 10–3:
Format for quarterly execution report (RCS CSGPO- 465), page 39 Section IV ALSE Maintenance Requirements, page 33 Maintenance requirements • 8–16, page 33 Inspection, maintenance, and repair • 8–17, page 33 Storage and work areas • 8–18, page 33 Chapter 9 Nonstandard Aircraft, page 33 Glossary Section I Acquisition and Use, page 33 General • 9–1, page 33 Policy • 9–2, page 33 Logistical support • 9–3, page 34 Index Section II Training and Standardization, page 34 Waiver Authority • 9–4, page 34 Official Publications • 9–5, page 34 Training and Standardization • 9–6, page 34 Qualification Training • 9–7, page 34 Flight Evaluations • 9–8, page 34 Qualification Requirements for IPs • 9–9, page 35 Chapter 10 The Army Flying Hour Program, page 35 Objective • 10–1, page 35 Responsibilities • 10–2, page 35 FHP concept of management • 10–3, page 35 FHP management cycle • 10–4, page 35 General FHP management policy • 10–5, page 35 Procedures for development of the POM FHP • 10–6, page 36 Procedures for development of the budget FHPs • 10–7, page 36 Procedures for developing the execution year FHP • 10–8, page 36 Procedures for submitting the quarterly projections report • 10–9, page 36 Procedures for reporting the execution year FHP • 10–10, page 36 Procedures for cross-leveling hours • 10–11, page 37 Procedures for use of the MACOM flying hour program diskettes 10–12, page 37 Appendixes A.
References, page 40 B. Internal Control Review Checklist, page 42 C. Instructions for Completing Mission Schedule/Brief (DA Form 5484-R), page 42 Table List Table 3–1: Crew endurance guide, page 10 Table 4–1: Synthetic flight training system, page 13 Table 5–1: Army VFR weather minimums, page 18 Table 5–2: Required equipment, page 19 Table 5–3: Aircraft equipment requirements for Category II Approaches, page 20 Table 10–1: FHP management reports, page 38 iii AR 95–1 • 1 September 1997