omron — ACE Sight Belt Calibration

ACE Sight Belt Calibration Testing the Encoder Operation You can click On/Off to move the belt. You need to have set the I/O values in the Inter- view Wizard. l Teach Upstream Limit (#1 in the following figure) Upstream, Downstream, and Downstream Pick Limits ACEUser's Guide, 3.6.x, 18316-000 Rev A Page 638