3.3. Operation Operation Picking up the multi-purpose bucket 2 1. Set the change-over lever for the additional control unit into position '2' (fig. 75_160). 2. Start the engine. 1 75_160 3. Unlock the quick-change unit by setting the control lever for special equipment into position ‘1’ (fig. G0065018.eps). 4. Lift the boom slightly, by setting the multi-function lever into position ‘H’ (fig. G0065021.eps). 5. Tilt the quick-change unit slightly to the front by setting the multi-function lever into position ‘A’ (fig. G0065021.eps) 6. Drive the machine to the work unit until the quick-change unit (1) is below the pickup hooks of the work unit.
Then, lift the boom until the work unit catches the quick-change unit. 7. Tip in the quick-change unit until the work unit is connected to the limit stops on the the quick-change unit by setting the multi-function lever into position ‘E’ (fig. G0065021.eps). 8. Lock the quick-change unit by setting the control lever for special equipment into position ‘2’ (fig. G0065018.eps). 9. Switch off the engine. 3-72 WA90-5 – VEAM270100