C-7: INSTALLATION OF AIR CONDITIONER (only when installing high cab) pull cable between the air conditioner unit and the Keep the electrical wiring connectors and the push- control panel still connected and put them on the floor. The air conditioner mount is the same as for the PC200-3. still connected) to the rear right of the operator’s Install the control panel (with the cables and wiring cab. Parts sent individually * When installing the control panel, tighten the ground connection using the bolt shown in the diagram be- low. 01010-50~16 C4j 01643-30823 (4) I Section A - A, scale l/25 52