Hino — Installation Steps

POWER TAKE OFF 00-35 3. Inner Rod Assembly Coat the threaded portion of the inner rod as- sembly tip with liquid gasket (LOCTITE 242 or equivalent) and insert and screw the tip from the front side of the PTO, then tighten it at a specified torque. When tightening the inner rod assembly, insert a Phillips screwdriver (large) in the control ca- ble connector groove, press it so that the spool valve will not rotate, then apply a wrench to the stopper adapter on the oil pump side to tighten it. (Besides, the three-rotation dump truck is in contrast with this.) Tighten: Inner rod to19 N m (1.9 kg m / 14 lb ft) NPA0077E Legend 1. PTO 2. Oil pump 3.

Coat shaft tip portion with grease Align and install the oil pump groove and the shaft width across flats of the PTO and tighten the bolt at a specified torque. Tighten: PTO bolt to 53 N m (5.4 kg m / 39 lb ft) Notice: Be fully careful so that dust or foreign matter will not be mixed in from the hose installation port of the oil pump. NPA0079E Legend 1. Oil pump 2. PTO 3. Inner rod assembly 4. High-Pressure Hose Install the high-pressure hose in the oil pump and firmly tighten the joint. Notice: If the oil pump is rotated and installed in the high-pres- sure hose in Item 10 described previously, firmly tighten the joint. 5. Low-Pressure Hose Install the hose and firmly tighten the hose band.

NPA0078E Notice: When installing both the high-pressure and low-pres- sure hoses, be fully careful so that dust or foreign matter will not be mixed in the hose port and oil pump. Legend 1. PTO 2. Bolt 3. Oil pump