OPERATION 3.16 OPERATION OF THE LUBRICATION SYSTEM ADJUSTMENTS OF THE CENTRAL LUBRICATION SYSTEM (For factory installed system only) The following adjustments can be made in the service menu of the ECS system: Level 4: Service Menu / Settings G *PAUSE TIME G *MONITORING TIME G *PRESSURE RELIEF TIME G *LUBE CYCLE COUNTER Refer to section "ELECTRONIC MONITORING AND CONTROL SYSTEM ECS" for description of adjustment procedure.
CENTRAL LUBRICATION SYSTEM ”CLS” Repairs on the Central Lubrication System with the Engines running or with the Engines OFF and Main Switch Key in ON position If repairs under the above conditions have been carried out it is necessary to reset the control circuit of the lubrication system by actuating the rotary switch (1), illust. (Z 21762) for a full lube cycle. If this manually actuated lube cycle is not being carried out, the fault message ”LUBE SYSTEM FAILURE” will remain on the ECS display (3). Resetting of the lube system control circuit can also be done by shutting down the engine and switching OFF the main switch key.
NOTICE For more information regarding inspection, trouble shooting and maintenance of the lubrication system, refer to the sepa- rate manual LUBRICATION SYSTEMS in volume 2 binder. 245