ZF — 2-ha30

Ch 2 page 203 TRANSMISSION Fasten the primary pump. 1 = Hexalobular screw (M10/10.9x60) *Tightening torque MA = 46 Nm 2 = Hexagon screw with washer (M8/10.9x100) *Tightening torque MA = 23 Nm 3 = Torx screw (M8/10.9x60) *Tightening torque MA = 23 Nm Figure 642 Install valve block (1) until contact and mount the bolted connection valve block/oil supply flange (2). Torx screws (M8/10.9x60) Hexagon screw with washer (M8/10.9x100) *Tightening torque MA = 23 Nm Hexalobular screw (M10/10.9x60) *Tightening torque MA = 46 Nm Figure 643 Install shifting block II (1) until contact and mount the bolted connection valve block/oil supply flange (2).

Torx screws M6/10.9x50) *Tightening torque MA = 9.5 Nm Torx screws (M8/10.9x60) Hexagon screw with washer (M8/10.9x100) Cylindrical screw with washer (M8/8.8x65) *Tightening torque MA = 23 Nm Figure 644 Install the temperature sensor - converter/retarder - with O-ring 9.5x2 *Tightening torque (M12x1.5) MA = 23 Nm Close all lockings of the plug connections wiring harness/pressure regulators/temperature sensors. Figure 645 SHOP MANUAL