Ch 2 page 211 TRANSMISSION Drive all slotted pins into the holes to installation dimension 5 +5 mm. Figure 674 Engage the locking wire 243x1 (1) into the lower annula groove and insert the thrust ring (2). Installation position of thrust ring. See Figure 675! Figure 675 By means of the lifting tackle insert the preassembled planet carrier into the ring gear. (S) Eyebolt 850317-00070 Figure 676 Insert the thrust ring (1) and engage the locking wire 243x1 (2) into the annular groove. Installation position of thrust ring. See Figure 677! Figure 677 SHOP MANUAL