. ATTACHMENTS, OPTIONS HANDLING PAYLOAD METER II (CARD TYPE) table. 6 - 45 *1: Between the start of the loading operation and the start of the d umping operation, always keep the d ump l ever at the FLOAT pos ecorded when du ecorded accurate With the display, [ oading, the time d isplay may be given instead of the distance *2: When the load is l ess than 50% of the maximum payload, 0 to *3: I f there is no new l oad within 5 minutes from the time of the pre Both the display p anel and external display lamps will change t o the display for "When empty, Stopped" in the *4:
I f the machine is s topped again before traveling 160 m, both th e display panel and external display lamps will lamps will r I eturn to the displa y for "During loading, Stopped" in the table. f the load is dump ed before traveling 160 m, both the display p anel and external display lamps will j ump to the display for "When dumping" in the table. *5: I f loading is carried out again when this happens: I " mmediately after l oading again, both the display panel and ext ernal display lamps will return to the displa y for During loading, S topped" in the table. *6:
I f the load that is d umped is not more than 50% of the maximu m pyaload, the machine will not recognize th at a l oad has been dum ped. It will consider it only as a movement o f the dump lever. (See *1) *7: The display for the total payload is given in units of 100 t (roun ded to the nearest 100). For the method of clearing the total payload (resetting of the m easurement to 0), see "FORCED DISPLAY OF TOTAL PAYLOAD AND OVERALL NUMBER OF CYCLES (P AGE 6-56)". When dumping, if the gear shift lever is at any position other th an N, [b-FL] flashes.
If the dump leve r is at any position other than FLOAT from the beginning of the loading op eration to the end of the dumping operation , the data will not be rec orded accurately. (See *1) The payload meter ret ains the existing condition when it is empty, during loading, and when it is loaded, even i f the power is turned OFF, condition. so when the operator starts operation again, the system starts from the existing machine