Yamaha — Yamaha BAIC Wheel Loader Steering System Service Manual

(8) Remove bolt (19), washer (20) and then take out cover (2) and shims (4, 5). UPPER 19,20 2 (9) Take out dust seal (13) from the cover (2). 13 (10) Remove the bearing (1), and dust seal (13). 4,5 29 29 1 13 75795SE16 (11) Remove bolt (19), washer (20) and then take out cover (17, 18) and shims (4, 5). LOWER (12) Take out the dust seal (12) from the cover (17, 18). 19,20 17 12 8 (13) Remove the bearing (1) and collar (8). 29 4,5 1 12 18 75795SE19 3) 3) INSPECTION INSPECTION (1) Check the bearing sliding surface for excessive wear, scorching or scratches; replace if necessary. (2) Replace all dust seals (12,13) with new ones.

(3) Grind any pins (7, 11) dented with an oilstone or replace any pins abrasive excessively. (4) Check inside cover (2, 3, 17, 18) and collar (8, 9) for dents or scratches; if any damage is found, correct with a grinder or replace. (5) The serviceable limit of pins and bushings is shown in the table below. Unit : mm 5-55 Item No. Name Std dimension Serviceable limit Remedy Outer dia Inner dia Clearance 7, 11 Pin 75 74.5 0.8 Replace 1 Tapered roller bearing 75.5 8, 9 Collar 75.5 12, 13 Dust seal When removed Replace