TCD 2015 Job card overview 5 © 06/2006 8146-001 10/22 Job card Activity Maintenance group W 03-08-01 Removing and installing genset support Crankcase W 03-08-03 Dismantling and assembling genset support Crankcase W 03-09-01 Removing and installing rear cover Crankcase W 03-09-04 Removing and installing the connection housing Crankcase W 03-11-01 Removing and installing, testing camshaft bearing Crankcase W 04-02-02 Removing and installing tappets, checking tappet bores Engine control W 04-04-09 Removing and installing the gearcase cover Engine control W 04-04-09 Removing and installing gear case cover (Railway) Engine control W 04-05-05 Removing and installing the camshaft Engine control W 04-05-06 Checking the camshaft Engine control W 04-05-07 Removing and installing injection pump camshaft Engine control W 04-06-03 Installing and removing turning gear Engine control W 05-07-01 Removing and installing the impulse transmitter (crankshaft) Speed governing W 05-07-03 Removing and installing the impulse transmitter (camshaft) Speed governing W 06-01-05 Removing and installing exhaust line (A-bank) Exhaust system / Charging W 06-01-05 Removing and installing exhaust line (B-bank) Exhaust system / Charging W 06-01-06 Removing and installing exhaust pipe (A-bank) Exhaust system / Charging W 06-01-06 Removing and installing exhaust pipe (B-bank) Exhaust system / Charging W 06-01-07 Removing and installing exhaust manifold Exhaust system / Charging W 06-01-07 Removing and installing exhaust manifold (A-bank) (Railway) Exhaust system / Charging W 06-01-07 Removing and installing exhaust manifold (B-bank) (Railway) Exhaust system / Charging W 06-02-03 Removing and installing the charge air line Exhaust system / Charging W 06-02-05 Removing and installing connecting pipe Exhaust system / Charging W 06-02-05 Removing and installing connecting pipe (Railway) Exhaust system / Charging W 06-06-04 Removing and installing turbocharger Exhaust system / Charging W 06-06-04 Removing and installing turbocharger (A-bank) (Railway) Exhaust system / Charging W 06-06-04 Removing and installing turbocharger (B-bank) (Railway) Exhaust system / Charging W 06-07-03 Removing and installing charge air pipe (A-bank) Exhaust system / Charging W 06-07-03 Removing and installing charge air pipe (B-bank) Exhaust system / Charging W 07-01-02 Removing and installing flame glow plug Fuel system