Doosan Infracore P600/XP535WCU-T4i (E90), HP450/VHP400WCU-T4i (E91) — 46614501.book

Operation & Maintenance Manual Noise Emission Introduction The compressor for which this Maintenance Log is provided conforms to U.S. E.P.A. Regulations for Noise Emissions, applicable to Portable Air Compressors. The purpose of this book is to provide (1) the Maintenance Performance Schedule for all required noise emission controls and (2) space so that the purchaser or owner can record what maintenance was done, by whom, where and when. The Maintenance Schedule and detailed instructions on the maintenance items are given on following page. Maintenance Schedule A. Compressed Air Leaks Correct all compressed air leaks during the first shutdown period after discovery.

If severe enough to cause serious noise problems and efficiency loss, shut down immediately and correct the leak(s). B. Safety and Control Systems Repair or replace all safety and control systems or circuits as malfunction occurs. No compressor should be operated with either system bypassed, disabled, or nonfunctional. C. Acoustic Materials In daily inspections, observe these materials. Maintain all acoustic material as nearly as possible in its original condition. Repair or replace all sections that have: 1) sustained damage, 2) have partially separated from panels to which they were attached, 3) are missing, or have otherwise deteriorated due to severe operating or storage conditions.

32 ITEM AREA PERIOD A. Compressed Air Leaks As Detected B. Safety and Control Systems As Detected C. Acoustic Materials Daily D. Fasteners 100 hours E. Enclosure Panels 100 hours F. Air Intake & Engine Exhaust 100 hours G. Cooling Systems 250 hours H. Isolation Mounts 250 hours I. Engine Operation See Operator’s Manual J. Fuels & Lubricants See Operator’s Manual