Industrial — Maintenance Schedule

PREVENTIVE MAINTENANCE SCHEDULE 5 (03/17) Y53-6077-1B1 5-25 PREVENTIVE MAINTENANCE (PM) INTERVALS SYSTEM COMPONENT MAINTENANCE TASK Recommended PM Interval I A B C D E Hub, Drum, and Hubcap Brake drums Inspect for visible cracks, heat checking, galling or scoring of the braking surface, and for severe corrosion on the outside surface. Check for out-of-round or oversize condition [0.080 in. (2 mm) more than the original diameter]. Replace as required. X Hubcaps Clean the sight window. Check the center plug, mounting flange, and fill plug for leaks and for proper installation. Replace broken or damaged parts. Check the lubricant level and add as required. X