Section 0 - Engine Disassembly and Assembly - Group 00 Engine Assembly (0-02) M11 Page 0-141 Install the discharge elbow, v-band clamp, and new o-ring seal on the turbocharger compressor discharge outlet. Tighten the clamp. Torque Value: 8 [75 in-lb] Install and tighten the oil drain line. Torque Value: 27 [20 ft-lb] Pour 50 to 60 cc [2.0 to 3.0 ounces] of clean engine oil in the oil supply hole of the turbocharger. Install the oil supply line to the turbocharger with two capscrews (M8-1.25 x 20). Torque Value: 20 [15 ft-lb] Install the other end of the supply line to the lubricating oil filter head and tighten.
Torque Convertor Cooler Disc - Installation Install the water pump bypass hose (3) and two hose clamps onto the water pump. Do not tighten the hose clamps at this time. Install the disc (2) into the water pump bypass hose. Install the top hose clamp for the thermostat housing connection (1).