6 Prior to each operation 6.1 General Information 67082 6 Prior to each operation 6.1 General Information 85051 6.1.1 General warnings Prior to operation In the following sections of this chapter, a procedure instruction refers to the following general warnings. Danger! Always stop the engine before carrying out any work on the machine. Moving machine parts and / or unexpected machine movement. Death or serious injury. Diesel engine OFF. Apply parking brake. Remove the ignition key. Remove key of battery isolating switch. Wait for machine parts which run on have come to a complete halt. Secure machine by wheel chocks. Ensure that the machine cannot be started by any third persons. Danger!
The front attachment, reel and feeder unit may drop uncontrolled. Death or serious injuries! Apply safety locks. Keep a safe distance from the hazard area. 87926 6.1.2 Check list for daily operation Observe the general warnings at the beginning of the Prior to operation chapter. Every time before operating the unit, the following activities must be carried out. Complete all necessary steps according to the maintenance chart. Chassis When changing the tyres, adjust the permitted rear axle track width if necessary . Check tyre pressure according to the front attach- ment and adjust according to the tyre pressure table if required. 00 0293 210 2 - BA DOMINATOR 150/140/130 - 12/09 101