TM2361 (24JUN08) 9015-20-128 450DLC Excavator Operation and Tests 062608 PN=618 References Install CINCH Contact 9015 20 ,128 –UN–14FEB01 T138057 A—Top of Tool D—Wire F—Junior Timer Slot I—Wire Tab B—Contact Support E—Micro Timer Slot G—Contact J—Insulation Tab C—Locator 1. Hold JDG708 crimping tool so that the tool is facing 3. Hold the contact in position and squeeze the tool you as shown (left side of graphic). Squeeze tool handles together until ratchet engages sufficiently to handles together and allow them to open fully. hold the contact in position. Do NOT deform wire and insulation tabs (I and J). IMPORTANT: Make sure that both sides of the insulation barrel are started evenly 4.
Insert stripped wire into contact insulation and wire into the crimping section. Do NOT tabs until it is butted against locator (C). attempt to crimp an improperly positioned contact. 5. Hold the wire in place. Squeeze tool handles together until ratchet releases. Allow tool handles to 2. Position the contact so that the mating end of the open and remove crimped contact. contact (G) is on the locator side of the tool (C). Wire and insulation tabs (I and J) should point to 6. Install contact into connector. (Go to procedure in top of tool (A). Butt wire tab (I) against the movable this group.) locator (C). CINCH is a trademark of the Cinch Co. LD30992,0000245 –19–31MAR06–1/1