John Deere 450DLC — Control Valve Check Valves Identification and Operation

TM2361 (24JUN08) 9025-05-64 450DLC Excavator Operation and Tests 062608 PN=702 Theory of Operation Boom 2 Regenerative Valve (check valve) (173)— spool (137). The bypass shutoff valve is shifted by an During boom down operation, the boom 2 regenerative external pilot line from the auxiliary spool pilot cap. check valve (173) is opened when return oil pressure Check valve will close if pressure in the 5-spool neutral from the head end of the boom cylinder becomes and power passages is higher than the pump 1 supply greater than the pump 1 supply oil pressure. Return oil oil.

See Bypass Shutoff (Auxiliary Flow Combiner) combines with the pump 1 supply oil flow to the rod Valve Circuit Operation. (Group 9025-05.) end of boom cylinder, preventing cavitation. See Boom Regenerative Valve Circuit Operation. (Group Travel Flow Combiner Circuit Check Valve (88)— 9025-05.) Blocks a higher supply oil pressure in the left control valve (84) from flowing to the right control valve (83) in Arm 1 Regenerative Valve (check valve) (174)— travel flow combiner circuit.

Travel flow combiner valve During arm in regenerative operation the arm (89) is opened by a pilot signal from travel flow regenerative switch valve (111) is closed, arm combiner pilot valve (75) in the pilot signal manifold. regenerative check valve (174) is opened when return See Travel Flow Combiner Valve Circuit Operation. oil pressure from the rod end of arm cylinder becomes (Group 9025-05.) greater than the supply oil pressure. Return oil combines with the supply oil flow to the head end of Bucket Flow Combiner Circuit Check Valve (92) arm cylinder, preventing cavitation. See Arm and Left Travel and Bucket Flow Combiner Circuit Regenerative Valve Circuit Operation.

(Group Check Valve (145)—Blocks a higher supply oil 9025-05.) pressure in the right control valve (83) from flowing to the left control valve (84) in bucket flow combiner Main Relief Valve Isolation Check Valve (4 Spool) circuit. Bucket flow combiner valve (146) is closed by a (86)—A higher pump 2 pressure closes the check pilot signal from the solenoid valve manifold port DP. valve so it cannot flow to the lower pressure side of See Bypass Shutoff (Bucket Flow Combiner) Valve control valve. The higher pressure is sensed by the Circuit Operation. (Group 9025-05.) main relief and power digging valve (85). See Main Relief and Power Digging Valve Circuit Operation.

Circuit Relief and Anticavitation Valves (95, 96, (Group 9025-05.) 100, 101, 122, 123, 127, 138, and 139)—The anticavitation valve opens when return oil pressure Main Relief Valve Isolation Check Valve (5 Spool) becomes greater than supply oil pressure to provide (87)—A higher pump 1 pressure closes the check make-up oil to prevent cavitation in the cylinder. See valve against the lower pressure so it cannot flow to Circuit Relief and Anticavitation Valve Operation. 9025 05 64 the lower pressure side of control valve. The higher (Group 9025-05.) pressure is sensed by the main relief and power digging valve (85).

See Main Relief and Power Digging Boom Reduced Leakage Check Valve (103) and Valve Circuit Operation. (Group 9025-05.) Arm Reduced Leakage Check Valve (120)—A reduced leakage valve is located on the boom cylinder Auxiliary Flow Combiner Circuit Check Valve head end circuit and the arm cylinder rod end circuit to (136)—When auxiliary function is actuated, bypass prevent boom or arm from drifting down while control shutoff valve (110) closes and hydraulic pump 1 supply lever is in neutral. See Boom and Arm Reduced oil flows from the 4-spool neutral passage through the Leakage Valves Operation. (Group 9025-05.) auxiliary flow combiner check valve to the auxiliary LD30992,000025B –19–15MAY08–3/3