TM2361 (24JUN08) 9025-05-81 450DLC Excavator Operation and Tests 062608 PN=719 Theory of Operation Bucket Regenerative Valve Circuit Operation 170 During bucket digging operation, return oil (184) from the bucket cylinder (170) flows to the hydraulic oil tank (47). 172 Return oil (184) from the bucket cylinder (170) enters the spool (94) and acts on the bucket regenerative check valve (172) inside the spool (94). When digging operation is done with the bucket rolled-out, the bucket moves faster 93 as compared with supply oil (180) from the pump (15). Therefore, pressure in the circuit between pump (15) and bottom of the bucket cylinder (170) decreases.
When 94 pressure in the bottom of bucket cylinder becomes lower than that of the top side, the bucket regenerative check valve (172) opens. Therefore, regenerative return oil (185) 91 –19–19APR06 from the top of the bucket cylinder (170) flows to the PRESSURE OIL 47 15 bottom side of the bucket cylinder and is combined with FROM PUMP 1 supply oil (180) from the pump (15). Consequently, the regenerative operation is done and speed of the cylinder 180 182 184 TX1006656 increases.
TX1006656 15—From Pump 1 47—Hydraulic Oil Tank 91—Bucket Regenerative Switch Valve 93—Power Passage Check Valve (bucket lift check) 94—Bucket Spool 170—Bucket Cylinder 170 172—Bucket Regenerative Valve 180—Supply Oil 91 182—Pilot Oil 184—Return or Pressure-Free Oil 185—Regenerative Return Oil 47 94 180 –UN–20APR06 172 182 184 TX1006681 185 TX1006681 During Regenerative Operation Continued on next page LD30992,0000261 –19–26APR06–1/2 9025 05 81 170 X1006681 91 47 94 180 172 182 184 185