Komatsu — 3.2.12 METHOD OF OPENING (TILTING) FLOOR

DETAILED CONTROLS AND GAUGES 5. Remove the two screws (2) (M10), then remove the trian- gular cover (3). 6. Open the engine rear cover (4) completely, then secure it (for further details, see "3.2.9 ENGINE REAR COVER"). 7. Open the cooling cover (5) completely, then secure it (for further details, see "3.2.10 COOLING COVER"). 8. Loosen the four fastening screws of the platform (6) (M14). 85