. OPERATION MACHINE OPERATIONS AND CONTROLS OPERATION MACHINE OPERATIONS AND CONTROLS REMARK O-ring down to the regular groove (4). 4. Install the stopper bolts and nuts for each pin, then grease the pin. NOTICE 3 - 112 Install the b When insta ucket exactly in lling the bucket, reverse o the O-ring rder to disma s are easily d ngs on the bos s of the ar m end as sh own in the ) on the right. W hen knock ing in the pin s, move the Inversion 1. Place the bucket in contac t with a fla REMARK g the pins, place the bucket so that it is in light contact with the ground.
When removin g the pins, plac e the buck et so that it is in light contact wi If the bucket is lowered strong ly to the gr ound, the res istance will be incr eased and it will be pins. After removing t he pins, make sur e that mud or sand does n ot get on them. Dus t seals are fitted at bot be careful not to 2. Remove th e stopper bolts and nuts, then remove pins (A) and (B), and re move the bucke t. 3. Install the bucket inversely . After the b of the reta securely. ucket is inverted , correct th e inclination a nd direction ining pin holes (1) and (2) and stabilize the bucket