Komatsu — INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)

. MAINTENANCE MAINTENANCE PROCEDURE must be repaired or replaced, so please 4 - 29 CHECK ROAD LINERS OR RUBBER SHOES (Machine e quipped with road liner or rubb er shoe) If th e r oad liners an d rubber shoe s are i n the following ondition, they contact you r Komat su distributor fo r repai rs or replacemen Lug Height If lug height "a" is reduced by w ear, the drawbar pull wil l drop. If "a" is l ess than 5 mm (0. 2 in), replace with a new part.

If the lug wears a nd the ste el cor d inside the shoe is exposed for two l inks or more , replace with a new p (Machin e equipp ed with rubber shoes) Rubber Shoe Steel Code Cuts If more tha n half of t he steel c ord l ayer on one side is cut, replace with a new