Komatsu — 24.4 EVERY 50 HOURS SERVICE

24. SERVICE PROCEDURE 24.4 EVERY 50 HOURS SERVICE 24.4.1 LUBRICATING NOTICE For the first 100 hours on new machines where the parts are settling in, carry out greasing every 10 hours. 1. Set the work equipment in the greasing posture below, then lower the work equipment to the ground and stop the engine. 2. Using a grease pump, pump in grease through the grease fittings shown by arrows. 3. After greasing, wipe off any old grease that was pushed out. 1 2 AM091440 3 4 7 5, 6 1. Boom cylinder foot pin (2 points) 1 AM091450 1 3-46