Isuzu — J9

J9 08/29/2007 ENGINE ELECTRICAL - LQ4 6L V8 OPERATION DESCRIPTION OPERATION NUMBER NPR W3/W4 N/W CREW NQR W4/W5 NRR W5500HD FRR WT5500 FTR FVR FXR HTR HVR HXR GENERATOR ASSEMBLY, DISASSEMBLE, INSPECT, TEST & REASSEMBLE POLICY: T ADD: A - To Replace Rotor, Drive End Frame, Pulley, Fan &lOr Front Bearing B - To Replace Stator C - To Replace Diode Trio o - To Replace Rectifier Bridge and/or Battery Post Terminal and/or Capacitor E - To Replace Resistor, Brushes, Brush Holder and/or Regulator F - To Recondition Complete INC:AII of the above additions. NOTE: ALL OF THE ABOVE ADDITIONS INCLUDE TIME TO INSPECT & TEST THE COMPONENTS (ON THE BENCH) UPON INSTALLATION OF A NEW PART.

G - To Replace Drive End Frame and/or Bearing J4080 0.7 0.4 0.3 0.3 0.4 0.4 1 0.1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - GENERATOR ASSEMBLY - REPLACE Diagnosis Time: You may claim up to the allowable labor hours depending on actual time performing diagnosis J4100 0.5 0-.5 - - - - - - PLUGS, SPARK - REPLACE POLICY: E INC: Gap check ONE actual time performing diagnosis. POLICY: E, T J4226 0.2 0-.3 - - - - - - - - - - - - IGNITION COIL, DISTRIBUTOR - REPLACE POLICY: E (California only), T INC: R&R air cleaner assy, D&C lead cable & high tension cable (ignition coil) actual time performing diagnosis.

J4340 0.2 0-.3 - - - - - - - - - - - - SENSOR, CAMSHAFT POSITION - REPLACE actual time performing diagnosis. J4350 0.5 0-.3 SENSOR, CRANKSHAFT POSITION - REPLACE POLICY: E actual time performing diagnosis. J4355 0.5 0-.3 - - - - - - - - - - - - SWITCH POWER - REPLACE POLICY: E, T J4430 0.2 - - - - - - SENSOR, KNOCK - REPLACE POLICY: E actual time performing diagnosis. J4437 0.2 0-.3 - - - - - -