Downloaded from https://www.everyspec.com MIL-HDBK-502: A MIL-HDBK-502: A CQUISITION CQUISITION L OGISTICS OGISTICS our mission requirements, and vendor competition is fierce for continuous product improvement. “COTS maintenance manuals and drawings are limited. At best they will allow repair and identify support to the LRU (circuit card, power supply, etc.). Any more extensive data is either proprietary or the vendor asks for extremely large sums of money. To be effective, the depot should be able to perform piece part repair. This is only possible through reverse engineering, mockups, or the development of ATE software.

The time and cost associated with these processes cannot be justified based on the quantities of equipment we buy. Instead we receive extended warranties and allow contractors who already have repair capability to repair failed LRUs. There is also the cost issue of training maintenance technicians on new equipment. “The type of equipment we procure has been found to have long mean times between failure. There are exceptions, but generally we get 2-3 years before any failures on our operator positions. Also technology is constantly evolving, and in many instances we are upgrading the system with this new technology within three years.

Because our equipment typically does not stay in the field a long time, it is not cost effective to strive for organic repair capability. “Although we possess some organic maintenance capability, the majority of COTS equipment is contractor supported. Rather than acquire the equipment and support capability on separate contracts as we did in the past, we found it beneficial to acquire them together. Tying the support capability into the equipment purchase is best accomplished by establishing a logistics support strategy early in the program before the RFP.” The experience of this agency is instructive. The following principles underlie the success of its efforts:

Plan for supportability from the initial planning stages. Base supportability strategies on the expected service life of the product. Be willing to consider nontraditional approaches to support: extended warranties, disposal upon failure, etc. 6-23