9.8.3 Tub support band a. Remove the tub from the appliance b. Release the retaining spring using a length of steel wire c. Remove the two nuts which secure the band to the tub (near the motor) d. Remove the support band Re-assembly : First fit the two bolts which secure the band to the tub, then, using a length of steel wire, re-attach the retaining spring 9.8.4 Drum a. Remove the tub from the appliance b. Remove the idle pulley c. Remove the screw and remove the ring. Remove the front counterweight and the tub flange with its sealing ring d. Remove the drum. 9.8.5 Replacing the stainless steel tub a. Refit the bellows seal to the tub flange. b.
Position the counterweight on the flange, ensuring that the reference points on the counterweight are in alignment with those on the bellows seal (59). c. After replacing the drum, position the flange-counterweight assembly on the tub, ensuring that the reference point on the counterweight is aligned with the indent in the support band (60) d. Fit the retaining ring with the screw in alignment with the welded seam on the tub (61) e. Tighten the ring fastening screw while tapping around the perimeter of the ring to ensure that it is firmly secured. f. Replace the pulley g. Replace the tub in the appliance. Re-connect the hoses to the tub in their original positions.
9.8.6 Rear counterweight a. Remove the rear cabinet shell b. Remove the screws which secure the counterweight in position c. Detach the counterweight from the tub. SOI/DT 2002-05 eb 108 599 35 23-17