Downloaded from https://www.everyspec.com FM 34-54 with the Theater J2 to give collection requirements to theater units such as Special Operations units. STEP 5. In addition to the TECHINT collection priority list for equipment, TECHINT elements are tasked to collect, inspect, or develop the following items: Threat equipment manuals or documents. Threat installations. Listing of TECHINT questions for the interrogation of EPWs. CB laboratories and samples. STEP 6. The 203d MI Battalion, in coordination with national S&TI agencies, maintains contingency TECHINT collection plans for possible threat forces.
When a TECHINT element deploys, it is given the TECHINT collection plan in order to prepare and train for operations. GENERAL EXPLOITATION PLAN: The JCMEC is expected to conduct this level of exploitation on all equipment in theater. The Corps RC TECHINT sections at the CMEC conduct this level on equipment that matched the MOSs in their elements. The TECHINT collection teams are prepared to do this, but normally would not do it on a large scale. Preliminary requirements for exploitation include— Preliminary photographs of CEM outside and inside (to shows status of equipment before assessment). An inventory.
Examine system for any written information (documents, operator manuals, maps), markings, data plates, or operating instructions. Identify all individual equipment components requiring separate analysis. If equipment requires further analysis beyond initial exploitation, begin planning for further detailed exploitation with national S&TI personnel. F-2 EXPLOITATION PLANS AND REQUIREMENTS